Project Task Link
Dynamically add links to tasks in the web interface.
Description
Project Task Link
This module allows to insert dynamic links in the description of tasks.
Table of Contents
Overview
As member of the group Project / User, I go the form view of a task.
In the description, I need to reference the task ID=18. Therefore, I write TA#18 in the description.
When I save, I notice that a link was inserted dynamically.
If I click on the link, the referenced task is open.
Portal
As user of the portal, I go to the form view of the task.
When I click on a dynamic link, the referenced task is open in a new window.
Advanced Setup
By default, the system uses the following regex to detect where to insert dynamic links:
[Tt][Aa]#?(?P<id>d+)
This means that inserting either TA#123, ta#123, TA123 or ta123 will generate a link that point to the task with ID=123.
To customize the format of references, please refer to the module project_task_reference.
Contributors
- Numigi (tm) and all its contributors (https://bit.ly/numigiens)